Second shift or buy another machine? Price both before you choose

Overtime, a second shift and a second machine all buy capacity. Here's how to price each in dollars, using real award loadings, and when the answer is to do nothing yet.

Updated 4 November 2026 · Loans Now editorial team

See if you qualify →No credit check to enquire
Row of CNC machines on a factory floor under a high-ceilinged shed, a second machine's worth of capacity

Quick answer

A second shift is usually cheaper to start, and a second machine is usually cheaper per hour once the extra work is steady. Under the Manufacturing Award, overtime costs 150% of the ordinary rate for the first 3 hours and 200% after, while an afternoon or night shift costs 115%. Price all three over 12 months, and buy the machine only if the work is proven to last.

Key points

  • Under the Manufacturing Award, a rostered afternoon or night shift pays 115% of the ordinary rate. Weekday overtime pays 150% for the first 3 hours, then 200%.
  • A shift buys capacity with no borrowing, but you need people to staff it. Overtime is the dearest way to run the same machine.
  • A machine adds capacity and a fallback if the first one breaks. It adds lead time, an installation date and a repayment that runs whether or not orders do.
  • Award rates rose 4.75% from the first full pay period on or after 1 July 2026, so any older shift-cost sums are out of date.
  • If the surge is seasonal or unproven, don't buy. Run overtime or a short shift, and revisit when the order book has shown its hand.

The machine runs flat out. Orders are queued, and customers are asking for dates you can’t give. You have three ways to make more: run it longer on overtime, add a second shift, or buy another machine. They look similar on the shop floor and very different on a spreadsheet.

Here’s how to put dollars against each, using the actual award numbers, so the choice rests on figures rather than instinct.

Which is cheaper: overtime, a second shift or a second machine?

In the short run, a second shift beats overtime on cost per machine hour. In the long run, a second machine beats both, but only if the extra work lasts.

Option Starts Cash outlay Main risk
Overtime Immediately Wages at 150% to 200% Fatigue, refusals, cost per hour
Second shift Once staffed Wages at 115% (afternoon or night) Hiring, supervision, a half-empty roster
Second machine After delivery and install Purchase or finance, plus an operator Repayments if the work dries up

Those wage figures come from the Manufacturing Award. If you’re under a different award or an enterprise agreement, swap in your own loadings; the method doesn’t change.

What do overtime and shift loadings cost under the award?

Under the Manufacturing and Associated Industries and Occupations Award 2020, the main loadings are:

  • Weekday overtime (day worker): 150% of the ordinary hourly rate for the first 3 hours, then 200%.
  • Saturday overtime (day worker): 150% for the first 3 hours, then 200%, with a minimum payment of 4 hours.
  • Sunday overtime: 200%, with a minimum payment of 3 hours.
  • Afternoon or night shift: 115%. Afternoon shifts finish after 6pm and at or before midnight. Night shifts finish after midnight and at or before 8am.
  • Permanent night shift: 130%.
  • Saturday shifts: 150%. Sunday and public holiday shifts attract higher rates again.

Two rules catch owners out. Overtime must, where reasonably practicable, leave an employee at least 10 consecutive hours off duty between working days. If someone is instructed to resume work without that break, they’re paid 200% until released. And overtime is for “reasonable” extra hours: an employee can refuse unreasonable ones, so overtime is a weaker foundation for capacity than it looks.

Rates also moved recently. The Fair Work Commission raised modern award minimum rates by 4.75% from the first full pay period starting on or after 1 July 2026, per the Fair Work Ombudsman. Any sum you ran last year needs redoing.

Illustrative example: a workshop that needs 30 more machine hours a week

Illustrative only: invented figures, no real business, and wages are before on-costs, which add to every option.

A small metal-parts workshop has one CNC machine running a day shift. Orders need about 30 more machine hours a week. Assume an operator’s ordinary rate of $35 an hour.

Option A: overtime. Six hours of overtime a day over five days. The first 3 hours cost $52.50 (150%), the next 3 hours cost $70 (200%). That’s $367.50 a day, or about $1,838 a week for 30 hours, roughly $95,500 over 52 weeks. The effective rate is about $61 per machine hour.

Option B: afternoon shift. A part-time afternoon crew for 30 hours a week at 115% costs $40.25 an hour, or about $1,208 a week, roughly $62,800 a year. That’s $40.25 per machine hour, but it assumes you can staff it, supervise it and fill it.

Option C: a second machine. Say the machine costs $180,000 and the total dollar cost of finance over five years comes to $40,000, so $220,000 all in, or $44,000 a year. Add an operator working 30 hours a week at ordinary time: $1,050 a week, about $54,600 a year. Year-one running cost is roughly $98,600, close to overtime. But from year two, as work grows, each extra hour on that machine is just labour. And you now have two machines, so a breakdown no longer stops production.

The pattern is typical. Overtime is cheapest to start and dearest to continue. A shift is cheapest over a year if you can staff it. The machine costs most up front and least per hour over its life, if there’s enough work to use it.

Run your own version through the cost of waiting calculator, putting the overtime premium in as the cost of making do. If the machine looks like the winner, you can check your options before you commit to a supplier.

When does buying the machine beat running more shifts?

The machine wins when three things line up:

  1. The extra work is proven. Signed contracts, repeat customers or a long order book, not a good month.
  2. You’d otherwise need more than one shift’s worth of hours. Past about 40 extra machine hours a week, a shift has to run most of the week anyway, and the labour is the same either way.
  3. Downtime hurts. If your single machine is also your single point of failure, a second one is insurance as well as capacity. See the hidden costs of old equipment.

It also helps if you’re already turning customers away. Our page on turning away work shows how to price that loss, and it’s often the biggest number in the whole comparison.

If you decide a machine is right, the tax side is worth a conversation with your accountant. The ATO’s instant asset write-off covers eligible assets under $20,000 for businesses with turnover under $10 million. Many production machines cost far more, and the asset must be first used or installed ready for use in the income year, so delivery and commissioning dates matter. Read our guide to installed ready for use by 30 June before assuming a June purchase lands in the right year.

When does a second shift beat buying?

A shift is the better call when the demand is real but uncertain. You can switch a shift off in a week. You can’t switch off a repayment.

It also wins when:

  • the surge is seasonal and you know it ends;
  • you have the people, or can hire casuals who’d welcome afternoon hours (see hiring now or waiting);
  • the delivery and installation window for the machine is long, so a shift covers the gap;
  • the floor space, power or compliance work for a second machine isn’t ready.

A word on casuals: loadings stack differently depending on the award and on whether the person is casual, so check the current pay guide for your own situation before building a roster around casual rates.

When is waiting the smarter call?

Sometimes none of the three is right yet. Waiting wins when:

  • you can’t point to orders beyond the next quarter;
  • the bottleneck is actually scheduling, setup time or a slow downstream step, not machine hours. Fixing that is free;
  • price, quality or yield on your current machine is the real issue, not capacity;
  • a model or supplier price change is due and you can plan around it (see supplier lead times).

The honest test: if the extra work disappeared in six months, which option would you regret least? Overtime and a shift both fade away. A machine stays on the books.

How do I run the comparison on my own numbers?

Four steps, one page:

  1. Measure the gap. How many extra machine hours a week do the orders really need, and for how long?
  2. Price each route over 12 months. Use your award’s current pay guide for overtime and shift loadings, including on-costs. For the machine, use the total dollar cost of finance plus an operator.
  3. Add the cost of doing nothing. Lost orders, late fees and customers who go elsewhere.
  4. Stress-test it. Cut the extra work by a third. Does the machine still stack up?

If it passes step 4, you have a decision. If not, you have a plan for a shift, and a date to look again.

Thinking a second machine might be the answer?

Good, because that’s a decision worth making with numbers on the table. Once you’ve done the sums above, a short conversation with one of our lending specialists can tell you whether the machine is fundable on your figures, and what a sensible structure looks like. Our 60-second enquiry asks what you want to buy, roughly what it costs and what your business turns over. There’s no credit check when you enquire, so asking won’t touch your credit file.

We also don’t send your details to a pile of lenders. A real person reads your answers, looks at your situation and calls you. Please fill the form in accurately, including the real quote and your real turnover, so we can match the right option the first time. And if the sums say run a shift instead, we’ll say so.

See if you qualify →

Frequently asked questions

How much does overtime cost under the Manufacturing Award?

For a full-time or part-time day worker, overtime is paid at 150% of the ordinary hourly rate for the first 3 hours and 200% thereafter. Saturday overtime for a day worker is 150% for the first 3 hours and 200% after, with a minimum payment of 4 hours. Sunday overtime is 200% with a minimum of 3 hours. Check the current pay guide and your own classification, and confirm which award or enterprise agreement covers you.

What is the shift loading for afternoon and night shifts?

Under the Manufacturing Award, an afternoon shift (finishing after 6pm and at or before midnight) or a night shift (finishing after midnight and at or before 8am) is paid at 115% of the ordinary rate. Permanent night shift is 130%. Saturday shifts are 150% and Sunday shifts are 200%. If you're covered by a different award or an enterprise agreement, the figures can differ.

Is a second shift always cheaper than overtime?

Per hour of machine time, usually yes, because 115% is less than 150% or 200%. But a shift needs a full roster, supervision, and enough sustained work to keep people busy. A shift that's half empty can cost more per unit than a few hours of overtime.

Can I claim the new machine under the instant asset write-off?

The instant asset write-off lets eligible small businesses (turnover under $10 million) deduct the cost of an eligible asset costing less than $20,000 in the year it is first used or installed ready for use. Many production machines cost more than that, in which case the asset generally goes to the small business pool instead. Ask your accountant which applies to your purchase. Tax is a reason to time the purchase well, not a reason to buy.

What if my overtime is only needed for a few busy weeks?

Then keep it as overtime. A machine bought for a short peak sits idle afterwards and its repayments carry on. Our guide to waiting being the smarter call applies squarely here.

How long does it take to get a second machine running?

It depends on whether it's in stock, made to order or imported, and then on delivery, installation, commissioning and staff training. Ask for a lead time in writing before you commit, because that period is when overtime or a shift is covering the gap anyway.

Does enquiring about finance affect my credit score?

Not when you enquire with us. The 60-second enquiry involves no credit check, and a credit check only comes up if you decide to go ahead.

Decided now is the time? See if you qualify.

A 60-second enquiry, no credit check to ask, and one lending specialist who works on your numbers rather than passing them around. If waiting looks smarter, we will say so.

Enquiring won't touch your credit file

No spray and pray

A real person does the thinking